Civic Issues
Topics getting the most attention in Mesquite public meetings, ranked by how frequently they are discussed.
3 issues in roads with medium priority
Road work: Pioneer paving, Flat Top Mesa repairs, Horizon closure
Starting Monday, September 14, waterline work on Pioneer Boulevard will shift all traffic to the south side for about a week, with drivers on prepared gravel base in one section — expect slow going between the convenience store and Willis Carrier.
Canyon Crest Boulevard Phase 2 and Falcon Ridge traffic signal
Two RTC-reimbursed projects will extend Canyon Crest improvements to the roundabout — improving fire response — and design a new signal at Falcon Ridge and Bertha Howe near the hospital.
Hafen Lane and Leavitt Lane road work
A Teamsters Union strike at Rinker Concrete has delayed precast box culvert deliveries, pushing back the Levitt portion of the drainage project, which also affects when Hafen can be closed for work.